Project Overview Project Update

M5000 Overview

  “5000 tonnes per day. The new worldscale plant benchmark.”

Methanol Holdings (Trinidad) Ltd (MHTL) commissioned its M5000 Mega Plant at its production complex in Point Lisas, Trinidad in November 2005. The plant produces 5,000 metric tons of methanol per day and, through the utilization of purge gas streams from the existing plants, is capable of producing an additional 400 metric tons of methanol per day. The combined production of 5,400 metric tons makes M5000 the largest methanol plant in the world.

The total production capacity of MHTL has now increased to approximately 4 million metric tons per annum.

The M5000 plant is built between the existing CMC plant and the TTMC I plant. This close proximity to the existing plants on the MHTL production complex will allow MHTL to exploit the available operational synergies.

M5000 World Class Team

MHTL maintained the team that has successfully carried its last three plants at Point Lisas from conceptual design through to sustained operations.

Engineering and Design Davy Process Technology
EPC Contractor: MAN Ferrostaal Ag /Proman Ag
Plant Management and Operations: Industrial Plant Services Limited
Financier: Kreditanstalt fur Wiederaufbau (KfW)

The M5000 plant allows MHTL to:

• Maintain competitiveness as a low cost producer
• Achieve greater synergies and economies of scale
• Consolidate MHTL’s position in the global marketplace


© Copyright Methanol Holdings (Trinidad) Limited